- Solutions
- Extraction systems
- Complete plant construction
- Extraction and filter systems
- Spare parts
- Explosion protection
- Filter elements
- Mobile extraction units
- Oil and emulsion mist separator
- Dust collection elements
- Accessories
- Industrial steel construction
- Plant platforms-machine staircases-industrial equipment
- Container construction
- CE conformity and load tests
- Chassis and vehicle frames
- Lifting equipment and heavy-duty transport racks
- Impeller and fan welding
- Machine frames and housings
- Metal filter by L+M AG
- Modular construction + industrial ventilation
- Special machinery and equipment
- Steel components
- Industry solutions
- Steel – welded construction
- Ø 2540 mm / height 1130 mm
- Weight 1750 kg
- 8 service doors, 2-part
- With assembly of the components
High-quality slip ring covers for reliable transmission of signals and energy.Waste heat and coal dust generated by the slip rings of a hydropower plant project are to be dissipated in a compact manner. As this machine component is the only visible element in the machine room, it should also satisfy the power plant operator in terms of aesthetics and workmanship.
Together with the customer, a slip ring cover was developed that compactly combines the essential design components to meet the requirements. In addition, a logistics and transportation concept for bringing the assemblies into the cavern was already implemented during the concept phase. During the implementation phase, the entire hood was completely assembled to ensure smooth installation on the construction site.
Specification
- Extraction systems